Design-Build Agreement review
Owner-design-builder agreement on a DBIA/AIA A141-style baseline, reviewed for the single-point-of-responsibility and standard-of-care terms.
Review your document — free → See a sample report- 6 document-specific checks
- + 114 general checks
- Nothing uploaded
- Free forever (MIT)
What it checks
Single point of responsibility recital
Critical · CON-101
Owner's program and basis-of-design documents
Critical · CON-102
Design standard of care versus performance warranty
Warning · CON-103
Pricing model and contingency
Warning · CON-104
Design review and owner approval rights
Warning · CON-105
Insurance including professional liability
Critical · CON-106
Every run also applies 114 general checks that belong to any agreement: structure, parties and signatures, defined terms, cross-references, dates, amounts, and one-sided terms.
Often reviewed with
How it works
- Open vaulytica.com — no account, nothing to install.
- Drop your PDF or DOCX. The document type is detected and only the checks that belong to it run, inside your browser tab.
- Get a Word report in which every finding quotes the clause and cites the rule and source behind it — one of 1,825 checks across 268 document types.